Fort Bliss
Multiple Jobs
MICC Fort Bliss
Buildings 614 and 618
Overview
Scope of Work: Installed aerial fiber for connectivity to multiple buildings
Date: September 2019
Value: $35,000
Requested Project Goals
The objective of this contract is to install new communications infrastructure, Inside Plant (ISP) and Outside Plant (OSP), and Non-classified Internet Protocol (IP) Router Network (NIPRNET) in Building 614 and 618.
Work Completed
With the project goals in mind, we were able to:
-
install new communication infrastructure
-
connected buildings by running splicing fiber
-
extended infrastructure to aerial fiber to make connections to existing network
-
created a pathway for new fiber optic cabling
-
installed new wall mounts
-
installed new communication data drops
Customer Satisfaction
Our client was very satisfied with the service provided. We were able to exceed the basic expectations of the scope of the project goals. Because of our ability to continually exceed expectations and provide exceptional service and support, we continue to obtain many contracts with Fort Bliss.
MICC Fort Bliss
Fort Bliss NEC
Overview
Scope of Work: LAN drops and other network infrastructure installation
Date: October 2019
Value: $110,000 - 8(a) set aside
Requested Project Goals
Bring obsolete and inoperable communication infrastructure in building 1009 to a functional state for current and future use.
Work Completed
With the project goals in mind, we were able to:
-
install 56 LAN drops
-
remove decommissioned equipment and wiring
-
install new grounding bar
-
run new copper/fiber optic cabling
-
install new rack
-
create a pathway from 1st floor to 2nd floor
-
presented a full test report to the client
Customer Satisfaction
Our client was very satisfied with the service provided. We were able to exceed the basic expectations of the scope of the project goals. Because of our ability to continually exceed expectations and provide exceptional service and support, we continue to obtain many contracts with Fort Bliss.
San Antonio Lighthouse For The Blind
Overview
Scope of Work: Installed new PA system with four horns
Date: March 2020
Value: $9,000
Requested Project Goals
New public announcement system with timed announcement software installed and configured for use.
Work Completed
With the Court's project goals in mind, we were able to:
-
installed a new public announcement system
-
installed outside EMT infrastructure
-
4 Valcom horns installed outside building 1002
-
installed necessary software
-
configured all timed public announcements and bugle calls
Customer Satisfaction
Our client was very satisfied with the service provided. We were able to exceed the basic expectations of the scope of the project goals. Because of our ability to continually exceed expectations and provide exceptional service and support, we continue to obtain many contracts with Fort Bliss.