Scope of Work: Install 4 high mast lights, complete foundation, wiring, and testing, coordinate with the electric company, and provide staff training and project closeout.
Installed three 12-strand fiber optic cables at Marshall Airfield, Fort Riley, with HDPE conduit, trace wire, and warning tape. Mounted fiber enclosures, spliced fibers, and provided test results to the customer.
Provide all labor, tools, materials, permits, and supervision to replace 2800 feet of fencing, demolish 1000 feet, and repair 2 sally ports at various locations…
The contractor shall repair or replace the disinfection system at White Sands Missile Range, NM, ensuring water is properly disinfected before discharge into Davies Pond
The project involved installing two 4-inch HDPE conduits over 1,750 feet, connecting to existing UHF Radio conduit, and adding a 1-1/4 inch NASA HDPE conduit for future use. Handholes were placed, duct integrity tested, and tracing wire installed. Road crossings used horizontal boring, and dust control was managed with a water truck.
A new university laboratory was built for STEM research, featuring state-of-the-art equipment, upgraded finishes, plumbing, electrical, and HVAC systems. The project included a Reverse Osmosis water system, enhanced lighting, and specialty exhausts.
Installed 200 new wireless access points with the necessary cabling, relocated 11 wireless access points (including new Cat6a cabling as needed), and replaced 208 wireless access points without cable movement, for a total of 419 wireless access points.
Engineered, furnished, installed, and tested (EFI&T) fiber optic and CAT 6 cabling, network switches, UPS, and conduits to integrate Bldg 7320 and Bldg 7232 into the existing infrastructure.
GSA Install Optic Fiber Grand Canyon National Park, AZ : Conducted a site survey to assess infrastructure, planned cable routing, and procured materials. Installed conduit, interduct, and fiber optic cable, ensuring proper alignment and compliance. Pulled, spliced, and tested the cable, restoring surfaces and securing access points for future maintenance.
GSA Booth 5 BRG Replacement DeConcini LPOE Nogales, AZ: A damaged pane of Ballistic Resistant Glass (BRG) at the DeConcini Land Port of Entry was replaced to eliminate a security risk. All necessary services and materials were provided to complete the project.
Installed a video teleconferencing system to connect the Northeast Court judge with customers at the East Side Regional Command Center for bond payments and municipal activities.
The fire alarm system at Santa Teresa Middle School was replaced, including new installations in the North Building, South Building, and Gym. Upgrades included smoke detection, voice notification, and fiber optic
Barracks 7 and 8 upgraded to 28 new electronic strike locks with a minimum pull force of 1,500 lbs, a Grade 1 fire rating, and durability of 500,000 strikes. Central access control panels were also replaced, along with ten call stations, which now feature a stainless steel finish and improved…
The existing access system at the Weather Forecast Office in El Paso, NM, is being replaced by an expanded Lenel S2 Net Box System with Mercury Hardware.
Upgrade of the U.S. IBWC’s Headquarters main conference room, from a legacy Polycom video teleconferencing system to a Crestron Flex Teams Room solution.
GSA Access Control & Camera Installation El Paso, TX : Installed IPDCE and IPDSE panels with power unit and battery backup, added mortise electric locks to doors, and set up…
At Columbus Elementary School we replaced the existing projector and furnished and installed HDMI extenders, video switches, control systems, and all associated hardware.
Successfully completed the repair and upgrade of the existing Holloman AFB Central Control Units and High Powered Speaker Systems. Installed new poles, speakers, and wiring as part of the project to bring the base to an operable and functional level. This project spanned across two phases.
Fiber optic cable installed between MOD2B and MOD13, this requirement supports the integration of 53SOPS mission equipment onto the 4SOPS operations floor, the install spans across two levels within BLD 400, Schriever Space force Base and required 400ft of multi-mode 48-strand fiber…